Background

Thornleigh Salesian College

Project Overview

General Works at the College included the Formation of a Two Storey Infill Extension to provide Private Staff Preparation Areas and Student Careers Interview Rooms. The External façade predominantly was an entire aluminium glazed screen to conform to current insulation criteria. Interconnection to the existing building transpired at each level. General Fitting Out Works were carried out to all newly formed areas prior to the Accommodation of Site Staff. All Works were carried out within Term time without disruption to the Education of the Pupils and the Day to Day running of the School.

The overall Value of the Contract exceeded £230k.

Following the success of the above Contact a further Improvement Scheme was negotiated which included the Full Refurbishment to Eight Toilet areas which included new Suspended Ceilings, Sanitary Ware, WC Partitions, Electrical / Mechanical Works, replacement doors, Decoration and Flooring Works.

The overall Value of the Contract exceeded £125k.

Project Description

  • Client: Thornleigh Salesian College
  • Location: Bolton
  • Sector: Education
  • Value: £355,000+