St John Fisher RC Primary School, Haughton Green, Manchester
Project Overview
The works comprise of the provision of a traditionally constructed single storey flat roof classroom extension and associated internal remodelling/alteration works. To include:
Demolition Works
Substructure Works
Ground Floor Construction
Structural Steelwork
External and Internal Wall Construction
Flat Roof Construction of an Elastomeric High Performance Felt System inclusive of an Integral Gutter System together with Roof Lights to allow for Natural Daylight
External Joinery Works
Fabrication and Installation of External Aluminium Screens and Doors
Installation of Fire Rated Veneered Fire Doors and Fully Glazed Screens
Finishes to Walls to include Plasterwork and Wall Tiling
Erection of Suspended Ceilings
Floor finishes comprising of Carpet Tiles, Linoleum and Barrier Matting
Decoration Works
Mechanical and Electrical Services
External Works comprising of Macadam Surfacing and Drainage Works.